The empty top half of the glass is just a redundant backup for the other half.
 
Go to printable version 
 
  Our Aircraft:
 
    Steen Skybolt
Pitts Model 14
Pitts S1
Knight Twister

 
  Products:  
    ONLINE STORE

Products Home
Bruntons Brace Wires
     About Bruntons
MT Props
Hoffmann Props
     Request Prop Quote
Vendenyev M14 Engines
Laminated Wing Spars
Laminated Leading Edges
Canopies
Motor Mounts
Wing Kits & Wing Jigs
Three-Section Wings
Piloti Shoes
VedaloHD Sunglasses
     Styles
     FAA Report on Sunglasses

 
  Builders:  
    Builder F.A.Q.
Construction
   Photos

Articles
Project Gallery
Submit Photos
Project Logs

 
  Resources:  
  News
Event Reports
Email List
Testimonials
Non-US Distributors
Links
Scale Models
Biplane Lore
About This Site
Website Updates
About Us
Contact / Visit Us

 
   

 
Project Log
Aircraft Construction - Pitts 14 Prototype

Lower Wing Details and First Fuselage Formers
Pitts 14 Prototype
Created: 12/10/2003
Updated: 05/05/2004
Link(s): N/A
 
Article by Mike Whaley
 
The lower wings were worked on during early November, with a lot of progress being made. The tip bows were installed, as was a lot of secondary structure, gussets, sheeting, wingtip foam, etc. Minor revisions have been made to many parts to improve the final product. On November 7th, Paul took the wing to the Pitts Fly-in in Ozark AL, where a lot of folks got to see it. Comments were favorable. After the fly-in, construction continued. We also began work on the fuselage shape, starting with creating templates for the formers along the fuselage and the turtledeck.


Click to view full image
The wing trailing edge on either end of the aileron wells is completely boxed with plywood for the required stiffness.  
Click to view full image
Here, J.C. Taylor seals the wood inside the box with epoxy varnish before it is enclosed. You can never be too careful with wooden wings when it comes to moisture.  
Click to view full image
The finished aileron bay end. It is now able to support the fabric and to anchor the trailing edge.  
Click to view full image
This shows the shape of the training edge aluminum... this is classical wood and fabric construction.  
Click to view full image
The underside of the wingwalk shows several stiffeners and is covered with plywood.  
Click to view full image
Plywood plates support compression loads within the wing. Some are full sheets, some can contain lightening holes where the loads are reduced. CNC machining makes the profiling of these plates an "art to part" process.  
Click to view full image
These spar doublers have been shaped so as to prevent concentrating stresses in one area of the spar.  
Click to view full image
This compression rib is an example of the kind of tweaks we've been making as we go along. This pushrod cutout will be re-shaped on production parts to have nice symmetrical arcs that don't look "chopped off" on the bottom. This is a cosmetic issue and will cause no compromises on the prototype airplane.  
Click to view full image
The wing attach plates installed on the forward spar.  
Click to view full image
The wingwalk bay before the deck plywood is installed. Another view of the wing attach brackets.  
Click to view full image
The wingtip bow is attached. Rubber bands and tiny brads can be a real help in glueing up (the brads are removed later.)  
Click to view full image
J.C. Taylor (left) and John Hollister install reinforcements to the wingtip bow. The fabric and ground handling both put a lot of stress on this structure, so it needs to be strong.  
Click to view full image
The prototype wingtip is shaped using foam. The prototype woll be used to pull off a mold form which will be used to construct fiberglass wingtips for the production birds.  
Click to view full image
The spar cap raises the surface of the spar to provide for a solid glue face between the spar and the plywood leading edge. This forms a strong "D-tube" structure.  
Click to view full image
A lower wing is all wrapped up for Paul to take to the big Pitts Fly-In in Ozark, AL. Everyone seemed to really enjoy the "work-in-progress".  
Click to view full image
Fiberboard was used to make initial templates for the firewall and fuselage forming bulkheads. This process takes critical effort and defines much about how the airplane will look when finished. (It also breaks-trail and makes things easy for our builders!) Barrett Brummett has broad experience building aerobatic biplanes, and he did a super job getting the profiles just right.  

Other entries in this series:
     Construction Begins    May 2003
     Fuselage Basic Structure    June 2003
     Fuselage Basic Structure Completed, Engine Arrives, Steve Culp Helps Out    July 2003
     Pitts Model 14 Introduced at Oshkosh    4th week of July 2003
     Curtis Visits to Continue the Design, Wing Construction Begins    August 2003
     Wing Construction Underway    September 2003
     Lower Wing Basic Construction    October 2003
      » Lower Wing Details and First Fuselage Formers    November 2003
     Fuselage Formers, Skin and Wing Details    December 2003
     Fuselage Side Panels and Upper Wing Construction    January 2004
     Wing-Root Fairings, Fuselage Skin Panels, and Upper Wing    February 2004
     Fuselage Side Panels, Wing Rigging, Engine Arrives    March 2004
     Sun N 'Fun 2004    April 2004
     Summer 2004 Status Update    May 2004
     Aluminum Turtledeck    1st week of June 2004
     Sheet Metal Work, AirVenture    4th week of June 2004
     Adjustable Seats, Part 1    August 2004
     Adjustable Seats, Part 2    December 2004
     Wings    December 2004
     Throttle Quadrant    December 2004
     Spring 2005    March 2005

If you have any additions or corrections to this item, please let us know.